What is RAS? Recirculating aquaculture explained
On this page
How the loop works
Water leaving the tanks carries four problems: solids, ammonia, carbon dioxide and a shortage of oxygen. Each treatment stage removes one of them.
- Solids removal. A drum filter screens out faeces and uneaten feed. Settlers and protein skimmers take heavier and finer fractions.
- Biological filtration. Bacteria in a biofilter turn toxic ammonia into nitrate.
- Degassing. A degassing tower strips CO₂ from the water.
- Oxygenation. Oxygen cones or aeration put oxygen back in.
- Disinfection. UV or ozone treats the water before it returns to the tanks.
A small share of water is replaced each day to control nitrate and make up for losses.
RAS, ponds and flow-through farms
| RAS | Pond | Flow-through | |
|---|---|---|---|
| Water use | Low, water is reused | High, plus evaporation | High, constant supply |
| Control | Temperature and water quality controlled | Depends on weather | Depends on the source |
| Land | Small footprint | Large area | Needs a reliable water source |
| Running needs | Power, oxygen, trained staff | Lower technology | Lower technology |
When RAS makes sense
- Water is scarce or expensive to pump and discharge.
- Land is limited or close to market.
- The climate is wrong for the species, so temperature must be controlled.
- Biosecurity matters and you want to control what enters the farm.
- You want year-round production at a steady output.
Numbers from a working farm
A commercial indoor RAS in Sweden held tilapia and catfish water around 30 °C all year. Energy use was about 3.1 kWh per kg of tilapia and 0.8 kWh per kg of catfish, varying only about ±15% between seasons (Bergman et al. 2020). Power is the running cost that a pond does not have.
What RAS asks of you
A RAS depends on power, pumps and oxygen running all day. It needs trained staff, a backup plan for failures, and a design sized on the real feed load. Read RAS design basics next, or see our delivered farms.
Send your numbers. Get a layout in 3 days.
Send species, target output and site size. A first layout comes back in 3 days, free.
- Layout, equipment list and flow balance
- Sized on your species and feed
- Made in our 12,000 m² factory
- No obligation to order
Keep reading