From first layout to a packed system in 35 days.
One team designs the system, builds most of the equipment in our own factory and commissions it on site. Here is each step, what you get at the end of it, and where RAS projects usually go wrong.
first layout
standard units
custom system packed
install and start-up
Four milestones.
3days
First layout
Tank layout, equipment list and flow balance, free.
7days
Samples
Sample units for OEM and distributor orders.
15days
Standard units
Standard equipment built and packed.
35days
Custom system
Built, tested and packed for shipping.
What happens, and who does it.
Design & feasibility
Send species, output and site. Get a free first layout, equipment list and flow balance.
Manufacturing & testing
Most equipment built in our 12,000 m² factory; every system tested before it ships.
Installation & commissioning
Our engineers install, commission and stay through biological start-up.
After-sales support
Remote video support and help from the engineers who designed your system.
The usual failure points, and the step that prevents each.
Most RAS problems are designed in or started in. These are the ones we plan against.
Stages sized on different numbers
Each unit is right on paper; together they fail at peak feed
Step 1: one flow balance for every stage
Faults found on site
Weeks lost waiting for parts abroad
Step 2: system tested before it ships
Scope left vague
Building, power or labour not ready when equipment arrives
Step 1 and quote: written scope split
Stocking too early
Ammonia and nitrite spikes in a new biofilter
Step 4: engineers stay through start-up
No backup
A pump or power failure can cause mass losses within a short time
Step 1: standby and backup oxygen designed in
Nobody to call
Small problems become losses
Step 5: the designers answer support calls
Three numbers to start.
Species, target annual output and site size are enough for a first layout. Water source and local climate help. A sketch of the building or existing tanks speeds things up but is not required.
- Species
- Target annual output
- Site or building size
- Water source and climate (helpful)
One team, start to finish.
We design it
The same engineers size every stage on one flow balance.
We build most of it
Tanks, filters, skimmers, MBBR, degassing and UV from our own factory.
We start it up
Engineers commission on site and stay through biological start-up.
We stay reachable
Remote video, email and WhatsApp after start-up.
Yes. Detailed engineering drawings are charged, and the fee is credited against the equipment order.
When the layout and equipment list are agreed. It ends when the system is built, tested and packed. Shipping, installation and start-up follow.
Yes. Send your design or list and we check the sizing before we quote.
Yes. Our engineers install, commission and stay through biological start-up.
An RAS equipment maker with 15 years in the field and a 12,000 m² factory in Boluo, Huizhou, China.
Send your site data. Get a first layout in 3 days.
Send species, target output and site size. A first layout comes back in 3 days, free.
- Layout, equipment list and flow balance
- Sized on your species and feed
- Made in our 12,000 m² factory
- No obligation to order
