Lead times & shipping

3, 7, 15, 35. Know when it leaves.

Drawings in 3 days, samples in 7, standard units in 15, and a custom system packed in 35. Here is what each clock delivers, what starts it, what can stop it, and what happens after the crates are closed.

3 days

drawings and proposal

7 days

sample units

15 days

standard equipment

35 days

custom system packed

Milestones

Four lead times.

01

3days

First layout

Tank layout, equipment list and flow balance, free.

02

7days

Samples

Sample units for OEM and distributor orders.

03

15days

Standard units

Standard equipment built and packed.

04

35days

Custom system

Built, tested and packed for shipping.

What starts the clock

From what, to what.

مدة التنفيذ
Delivers
Starts when

3 days

First layout, equipment list, flow balance

We have species, output and site size

7 days

Sample unit for OEM or distributor orders

The sample order is confirmed

15 days

Standard equipment packed

The order is confirmed

35 days

Custom system built, tested and packed

Layout and equipment list are agreed

We confirm the schedule for your order with the quote.

What can delay it

The usual reasons a date moves.

Most delays come before the clock starts, not after. These are the ones we check with you.

Cause
Effect
How to avoid it

Layout changed after it was agreed

The 35-day clock restarts for the changed parts

Settle the layout before ordering

Voltage or plug type not confirmed

Motors and control cabinet wait

Confirm 220, 380 or 110 V and phase with the order

Seawater not stated

Materials must be changed

State salinity at the layout stage

Site not ready on arrival

Equipment waits; engineers wait

Building, power and water ready to the agreed scope

Import documents missing

Goods held at customs

Agree documents with your importer early

الشحن

Delivered to China, Kazakhstan, Saudi Arabia and Japan.

We have shipped and commissioned systems in four countries. Lead times end when the system is packed; shipping time depends on the route. Shipping terms and the delivery route are agreed per order.

Rows of circular RAS tanks at the Kazakhstan tilapia farm
After packing

From the factory gate to running fish.

المرحلة
Who
Note

الشحن

Agreed per order

Route and terms set in the quote

Customs and delivery to site

Usually your importer or agent

Documents agreed early

التركيب

Our engineers, with local labour as agreed

Site ready to the agreed scope

التشغيل التجريبي

Our engineers

Each unit run with water

Biological start-up

Our engineers stay

Until the biofilter is running

Why buy it from us

Fixed clocks, stated up front.

15-day standard units

Built and packed.

Own factory

Most units do not wait on another maker.

Four countries

China, Kazakhstan, Saudi Arabia, Japan.

Schedule with the quote

Dates in writing.

الأسئلة الشائعة

Lead time questions.

Tell us your date. We say honestly whether it is possible.

No. Lead times end when the equipment is packed. Shipping time depends on the route.

Terms are agreed per order. Tell us what you need.

Mostly changes after the layout is agreed, or details like voltage and salinity confirmed late.

Yes. Every system is tested at the factory before it ships.

After delivery, when the site is ready for installation.

Next step

Send your list. Get a schedule with the quote.

Send species, target output and site size. A first layout comes back in 3 days, free.