Drawings in 3 days, samples in 7, standard units in 15, and a custom system packed in 35. Here is what each clock delivers, what starts it, what can stop it, and what happens after the crates are closed.
Tank layout, equipment list and flow balance, free.
02
7days
Samples
Sample units for OEM and distributor orders.
03
15days
Standard units
Standard equipment built and packed.
04
35days
Custom system
Built, tested and packed for shipping.
What starts the clock
From what, to what.
مدة التنفيذ
Delivers
Starts when
3 days
First layout, equipment list, flow balance
We have species, output and site size
7 days
Sample unit for OEM or distributor orders
The sample order is confirmed
15 days
Standard equipment packed
The order is confirmed
35 days
Custom system built, tested and packed
Layout and equipment list are agreed
We confirm the schedule for your order with the quote.
What can delay it
The usual reasons a date moves.
Most delays come before the clock starts, not after. These are the ones we check with you.
Cause
Effect
How to avoid it
Layout changed after it was agreed
The 35-day clock restarts for the changed parts
Settle the layout before ordering
Voltage or plug type not confirmed
Motors and control cabinet wait
Confirm 220, 380 or 110 V and phase with the order
Seawater not stated
Materials must be changed
State salinity at the layout stage
Site not ready on arrival
Equipment waits; engineers wait
Building, power and water ready to the agreed scope
Import documents missing
Goods held at customs
Agree documents with your importer early
الشحن
Delivered to China, Kazakhstan, Saudi Arabia and Japan.
We have shipped and commissioned systems in four countries. Lead times end when the system is packed; shipping time depends on the route. Shipping terms and the delivery route are agreed per order.