Turnkey fish farm

One contract, from layout to the first harvest.

Layout, tanks, treatment loop, oxygen, controls, install and biological start-up. One team owns the design and the result. Below: exactly what that covers, what it does not, and how to compare turnkey quotes.

3 days

first layout, free

35 days

custom system packed

On site

to biofilter start-up

15

delivered projects

Scope

What one contract covers, and what it does not.

“Turnkey” means different things to different suppliers. This is how we split it. Gaps in scope are the most common cause of delay and extra cost, so we put this split in writing with the quote.

Item
RASTANK
You, or agreed per project

Layout, equipment list, flow balance

First layout free, in 3 days

—

Detailed engineering drawings

Charged; fee credited against the equipment order

—

Tanks, drum filters, skimmers, MBBR, degassing, UV

Made in our factory

—

Oxygen, ozone, settlers

Supplied, fitted and tested with the system

—

Pumps, valves, instruments, control cabinet

Sized, supplied and tested with the system

—

Building, floor slab, drain trenches

We specify what the building must provide

Civil works agreed per project

Power and water to the site

We specify the supply needed

You provide the connection

Installation and commissioning

Our engineers on site

Local labour agreed per project

Biological start-up

Engineers stay until the biofilter is running

Your team trained alongside

After start-up

Remote video, email and WhatsApp support

—

How the design is built

Worked back from your harvest.

A RAS is designed in reverse: the harvest you want sets the standing biomass, the biomass and feeding rate set the peak daily feed, and the feed sizes every treatment stage (). That is why the first questions are always species, target output and harvest size.SRAC Publication 282

Engineer designing a RAS fish farm layout in 3D software
From message to start-up

Drawings in 3 days. A packed system in 35.

01

3days

First layout

Tank layout, equipment list and flow balance, free.

02

7days

Samples

Sample units for OEM and distributor orders.

03

15days

Standard units

Standard equipment built and packed.

04

35days

Custom system

Built, tested and packed. Install and start-up follow on site.

Comparing turnkey quotes

Six questions to ask every supplier.

Two turnkey quotes can look alike and cover very different things. These are the questions we would ask, and how we answer them.

Ask
Why it matters
Our answer

Is every stage sized on the same feed number?

A biofilter sized on tank volume stalls when feed rises

Yes: one peak feed number for every stage

What is the standby?

A single pump or oxygen supply can stop the farm

Standby pumps, blowers and oxygen designed in

What happens in a power cut?

Fish can be lost within minutes without backup oxygen

We plan backup oxygen, generator and alarms with you

Who stays for start-up?

Most early losses happen while the biofilter matures

Our engineers stay until it is running

Which units are made, which bought?

You need to know who stands behind each part

Listed per unit in the quote

What is excluded?

Building, power and labour are often left vague

Written scope split, as above

On power cuts: a farm manager described fish surviving a 20-minute outage only because backup oxygen opened by itself ().Global Aquaculture Advocate, 2010

Why buy it from us

One team owns the flow balance.

Own factory

12,000 m² in Boluo, Huizhou. Most units made in-house.

Sized together

Every stage against the same flow and feed.

On site to start-up

Engineers stay until the biofilter is running.

15 delivered

In China, Kazakhstan, Saudi Arabia and Japan.

Delivered projects

Farms we delivered.

52 tanks, six parallel trains, one cold winter

Kazakhstan · Volume2,160 m³ · SpeciesTilapia · TypeNew build
Kazakhstan

11 tanks inside a building that could not be dug

Japan · Volume240 m³ · SpeciesEel · TypeNew build
Japan

4,900 m³ bass RAS, Zhangzhou

Zhangzhou, China · SpeciesBass · TypeNew build
Zhangzhou, China
FAQ

Turnkey questions.

We design the system and tell you what the building must provide: floor area, levels, power and water. Civil works are agreed per project.

A custom system is packed in 35 days. Shipping, installation and biological start-up follow. We give a full schedule with the quote.

Nothing. Detailed engineering drawings are charged, and the fee is credited against the equipment order.

Yes. They install, commission and stay through biological start-up, until the biofilter is running.

Species, target output and harvest size, and the site or building. A floor plan and photos help.

Tanks, drum filters, protein skimmers, MBBR biofilters, degassing towers and UV sterilizers. Other units are supplied, fitted and tested with the system, and the quote lists which.

Remote video, email and WhatsApp support from the engineers who designed your system.

Start here

Send species, output and site. Get a turnkey layout.

Send species, target output and site size. A first layout comes back in 3 days, free.