Design & feasibility

A first layout in 3 days, free.

Send species, target output and site size. In 3 days you get a tank layout, an equipment list and a flow balance, so you can judge the project before you spend. If the numbers do not work, we say so.

3 days

first layout

Free

layout, list, flow balance

Credited

drawing fee, against the order

3 numbers

enough to start

Two stages

What the first layout gives you, and what the drawings add.

First layout (free, 3 days)
Detailed drawings (charged, credited)

Tangki

Number, size and position

Dimensioned positions, levels, drain falls

Peralatan

List of every unit and why it is that size

Models, connections and installation details

Flow balance

Flow, feed load and oxygen across every stage

Pipe sizes and head losses

Bangunan

What the building must provide

Loads, openings, power and water points

Assumptions

Stated, for you to confirm

Confirmed values

Gunakan

Judge the project; compare suppliers

Build and install from

The drawing fee is credited against the equipment order.

How the design is built

Worked back from your harvest.

A RAS is designed in reverse: harvest size and tonnage set the standing biomass, density and feeding rate set the peak daily feed, and the feed sizes every treatment stage (). That is why we ask for output before anything else.SRAC Publication 282

Engineer designing a RAS fish farm layout in 3D software
Inputs

What we ask for, and why.

Input
Mengapa ini penting

Spesies

Sets temperature, density, oxygen and water quality limits.

Target annual output and harvest size

Sets standing stock and feed load.

Site or building size

Sets tank layout and treatment area.

Water source and salinity

Sets materials and treatment stages.

Local climate

Sets heating, cooling and building needs.

Power supply

220, 380 or 110 V, and backup.

Existing tanks or building

For upgrades and fit-outs: photos or drawings.

Missing a number? Send what you have. We work from stated assumptions until you confirm them.

Feasibility checks

What tells you early that a project will not work.

The first layout is also a test. These are the points where we tell clients to stop or change the plan.

Periksa
Warning sign

Climate vs species

Heating or cooling the water all year for a species far from its range

Water supply

Make-up water too little, too salty or untreated for the species

Daya

No reliable supply, and no plan for backup

Bangunan

Too little height, floor load or space for the treatment loop

Output vs site

Target output needs a density the species or system cannot hold

Team

No one on site trained to run a RAS daily

From layout to quote

Four steps.

01

3days

First layout

Free. Based on your numbers and stated assumptions.

02

Refine

We adjust the layout with you until the design fits.

03

Detailed drawings

Charged, and credited against the equipment order.

04

Quote

Equipment, services and schedule.

FAQ

Design questions.

It lets you judge the project before spending. Detailed drawings are charged and credited against the order.

Send what you have. We state the assumptions we use, and you confirm or correct them.

The layout gives you the equipment list and flow balance. Budget numbers come with the quote, based on your inputs.

Yes. We check flow balance, materials and redundancy.

Yes. The feasibility checks above are part of the first layout.

Start

Send three numbers. Get a layout in 3 days.

Send species, target output and site size. A first layout comes back in 3 days, free.